Project Background: This project involves deploying a hybrid solar system at a school, aimed at improving energy reliability and promoting clean, renewable energy. To ensure continuous power during non-solar hours or grid outages, the system integrates a 197kWh large-scale ESS, enabling the school to significantly reduce grid dependence and ensure uninterrupted learning. Configuration: PV array 60kWp, Inverter 50kW, ESS 197kWh. Application: Self-consumption + emergency backup, 24/7 operation.
Source: VESTWOODS Energy Storage Case Platform

