Project Background: This project involves deploying a hybrid solar system at Juja St. Peter School, aimed at improving energy reliability and promoting clean, renewable energy use. To ensure continuous power even during non-solar hours or grid outages, the system integrates a 197kWh large-scale ESS. This configuration enables the school to significantly reduce dependence on the national grid and ensure continuity of learning activities. Configuration: PV array 60kWp, Inverter 50kW, ESS 197kWh. Application: Self-consumption + emergency backup, 24/7 operation.