This solar-storage project is deployed in two phases for CICEDEW in Lusaka, Zambia, to deliver uninterrupted power support for production and operation. The local grid suffers from poor power stability; outages easily disrupt production workflows and reduce operational efficiency, and conventional backup power has supply gaps during switching. The first phase installs 130kW PV paired with a 100kW/215kWh Vestwoods all-in-one hybrid inverter/BESS solution, and the second phase expands with 60kW PV and an 80kW/197kWh system. Both support seamless switching across the grid, PV, energy storage and diesel generator with automatic genset changeover. With solar-storage as the primary power source, PV self-consumption cuts production electricity costs, and multi-source complementation ensures continuous and stable production operation.

CICEDEW Factory Energy Storage in Zambia
- Country / RegionZambia
- System capacity130KW PV + 100kW/215KWh; 60kW PV + 80kW/197KWh